The 30MW photovoltaic power generation project on the roof of Shandong Shouguang Agricultural Products Logistics Park is built on the roof of Shouguang Agricultural Products Logistics Park. The total installed capacity is 30MW, occupying about 330,000 square meters of the building roof. The whole station is divided into 27 generating electronic units. A total of 117,458 photovoltaic modules of 270W are laid, and 601 series inverter of 50kW is configured. The 35kV voltage level is connected to Shandong power grid.
The project will go online on June 28, 2017.