"Wanda Plaza" project of Taizhou Hailing Wanda Pla
The Author:2020-06-17 16:43Traffic:


 
 
"Wanda Plaza" project of Taizhou Hailing Wanda Plaza Investment Co., LTD
No. 1 special substation: 10536kVA, located in the north of the first underground floor of large commercial building, is equipped with 4 dry transformers of 2000kVA. Double power supply, two power supply capacity of 5268kVA.
2 special substation: 4250kVA, located in the north side of the large commercial basement, is a newly built 10kVA open and close station (1# open and close station), with 2 units of 1600kVA dry transformer. Double power supply, two power supply capacity of 2125kVA.
3. Special substation: Equipped with 2 dry transformers of 1000kVA.
4. Special substation: Equipped with 2 sets of 2000kVA dry transformer.
5. Special substation: Equipped with 2 dry transformers of 1000kVA.
6. Special substation: Equipped with 2 sets of 2000kVA dry transformer.
7 special substation: Equipped with 4 dry transformers of 1000kVA.
8. Special substation: Equipped with 4 dry transformers of 1000kVA.
9. Special substation: Equipped with 4 sets of 2000kVA dry transformer.
10 special substation: Equipped with 4 dry transformers of 1000kVA.